The upgrade involved increasing the capacity of the existing culvert running under High Street and Station Street on the main road into Leeston and improvements to the Volkmans Road drain which the culvert empties into. The work required removal of the existing culvert and replacing it with twin precast box culverts, both cast in-situ and gabion headwalls, widening and planting of the Volkmans drain.