Work locations:
Five street renewals on residential streets.
Two streets with businesses, including the Rolleston medical centre and physiotherapy buildings.
Brookside Road, a main arterial route south from the Township.

The work required:
750m of 450 PE main; 1.5kms of 150 PVC mains; 760m of 100 PVC; 900m of 63 submains, including 90 house connections
Dig and lay method, with deep shield work for the 450 main when needed
Connection required to the existing Moore Street water treatment plant.
Night works to ensure water supply continued for commercial use.