Due to the deteriorated state of the existing seawall, CORDE undertook necessary minor improvements as a contract variation to prevent any potential collapse of the retaining wall during the construction phase.
Among the measures implemented to address this concern, we opted for the utilisation of a smaller excavator on the roadside. This strategic decision aimed to minimise point loading and mitigate the risk of structural instability. Consequently, we adjusted our methodology by introducing a foreshore excavator to compensate for the reduced reach of the excavator used on the roadside. The job achieved a PACE Score of 83%.
Skip to content
